visual metronome

Coming soon to iPhone, iPad, and Android

Make keeping time fun.

Pick a scene, from a ping-pong rally to a heart monitor, and watch the beat coming before you hear it. Every click is placed to the millisecond, and it never drifts.

Table for two

Visuals that improve tempo

Actual in-app footage. These visuals are designed to help improve your sense of rhythm.

Included

Six scenes, free with the app.

Premium $0.99 each (USD)

Yours to keep with a one-time purchase. Every scene has a live preview, so you can try it at your tempo before you buy.

Accuracy is our top priority

Steady as a rock, from 1 to 800 BPM.

<1 sample

Sample-accurate clicks

Every click placement is calculated based on each audio sample with drift adjustment baked in. This means every click is within 21 microseconds of where it should be at 48 kHz, with no delays that accumulate over a long practice session.

0 drift

Visuals can't fall behind

Every frame is drawn from the audio clock accounting for the moment it reaches your screen hardware. When your phone gets loaded down, it prioritizes staying in sync and drops frames rather than falling behind.

1–800

Any tempo you need

Swipe, tap ±1, type an exact number, tap a rhythm, or hold for six beats to measure one. Presets keep your favorites just a tap away.

For our music teachers

The metronome your students will want to use.

A blinking light is easy to ignore. A cat thwacking yarn is not. Put it on the music stand and the whole room can see the beat. Use “On the podium” to follow along a virtual conductor.

Beyond the click

Fun on the surface. A precise tool underneath.

Shape the perfect tempo change, and keep the metronome in reach without ever unlocking your phone.

Coming soon.

Visual Metronome 2.0 is putting on its finishing touches. The App Store link will land here at launch.

From the same family

Visual Tuner

Make tuning fun. Scenes that come alive when you hit the note, with a tuner as accurate and as fast as your phone allows.

For iPhone, iPad, Mac, and Android · coming soon